top of page
BR Heavy Construction Featured Projects

Spring Creek Crossing - Broken Arrow, OK

Spring Creek Crossing.JPG

Spring Creek Crossing is a 34 acre development site that includes Earthwork, Sanitary Sewer, Water, and Storm Sewer infrastructure as well as concrete curb/gutter and asphalt paving.

The Fountains - Bixby, OK

Fountains.JPG

The Fountains is a 16 acre development site that includes Earthwork, Sanitary Sewer, Water, and Storm Sewer infrastructure as well as concrete curb/gutter, asphalt paving, and natural stone retaining walls.

Konawa Pump Station - Konawa, OK

Konawa.JPG

Konawa Pump Station is a 23 acre site and includes site Earthwork and excavation for new facility buildings and structures including the construction of a new pond.

Skiatook Public Safety - Skiatook, OK

Skiatook.JPG

Skiatook Public Safety is a 30 acre site and includes site Earthwork for a new facility including rework and restablization of an existing pond.

Featherstone - Centerton, AR

Featherstone.JPG

Featherstone is a 38 acre development site that includes Sitework/Earthwork activities including construction of house pads, paving areas, and construction of 2 ponds.

Lancaster Park -Coweta,OK

2-3-26 (2).jpg

Lancaster Park was a utility project we did for Glenwood Homes; a residential builder. We placed over ten thousand linear feet of storm, sewer, and water varying in sizes to accommodate for a new residential edition.

Artesia Phase 2 - Broken Arrow, OK

Artesia 2.JPG

Artesia Phase 2 is a 6 acre development site that includes Earthwork, Sanitary Sewer, Water, and Storm Sewer infrastructure as well as concrete curb/gutter and asphalt paving.

Creekside Phase 2 - Broken Arrow, OK

Creekside 2.JPG

Creekside Phase 2 is a 16 acre development site that includes Earthwork, Sanitary Sewer, Water, and Storm Sewer infrastructure as well as concrete curb/gutter and asphalt paving.

Okemah Water Treatment Plant - Okemah, OK

Okemah.JPG

Okemah Water Treatment Plant is a 5 acre site and includes site Earthwork and excavation for new facility buildings and structures including 2 new holding ponds.

Buff Creek - Broken Arrow, OK

5-26-26 (2)_edited.jpg

Buff Creek is a 40 acre development site that includes Earthwork, Sanitary Sewer, Water, and Storm Sewer infrastructure as well as concrete curb/gutter and asphalt paving.

Chapel Grove - Springdale, AR

Chapel Grove.JPG

Chapel Grove is a 42 acre development site that includes Sitework/Earthwork activities including construction of house pads, paving areas, and construction of 2 ponds.

Reserves at Cedar Ridge- Bixby,OK

12-31-25 (1).jpg

The Reserves at Cedar Ridge was a 32-acre residential development that included earthwork, paving and utilities. While onsite we constructed rock retaining walls and prepared all subgrade for the paving.

bottom of page